公司动态 所在位置- 首页-新闻中心-公司动态楼承板工程进行时的各项注意事项

楼承板工程进行时的各项注意事项

发布时间:2022-10-13 来源:http://www.hhqhq.com/

在楼承板工程日常使用中,楼承板也需要好好的进行维护保养注意各种事项,下面济南楼承板厂家为您分享。
In the daily use of the floor bearing plate project, the floor bearing plate also needs to be well maintained and attention should be paid to various matters. Now, Jinan floor bearing plate manufacturer will share with you.
要注意楼承板的?;?,屋顶的安装和?;ひ话阍谇缣?,安排安装人员对有缺陷的锁缝、钉子等部位进行?;ず图庸?。需要时更换,易积水的地方应密封。边缘面板需要更正。
Attention shall be paid to the protection of the floor bearing plate. The installation and protection of the roof are generally in sunny days. The installation personnel shall be arranged to protect and reinforce the defective lock seams, nails and other parts. Replace when necessary, and seal the places where water is easy to accumulate. The edge panel needs to be corrected.
彩钢板屋面的防漏效果很大程度上取决于安装单位的现场施工经验业=性。技术人员要了解装配式房屋的设计和结构,不同材料的施工工艺和安装步骤,以及各种防水材料技术的优缺点和实际使用的关键,取长补短,优化组合,并根据现场工程实践制定合理的施工方案及相关技术措施。
The leakage prevention effect of color steel plate roof largely depends on the on-site construction experience of the installation unit. Technicians should understand the design and structure of prefabricated houses, the construction process and installation steps of different materials, as well as the advantages and disadvantages of various waterproof materials and the key to actual use, learn from each other, optimize the combination, and formulate reasonable construction plans and relevant technical measures according to the site engineering practice.
安装完成后,查看整个安装的屋顶。如有缺陷,及时修补漏水处,清理屋面施工安装现场,并通知相关人员检查。检查方法包括冲洗测试或雨后检查。在保证封闭式楼承板的室内承载和传动纵向空间时,应提前防止结构过度变形,防止压杆变形,保证室内结构的整体稳定性。
When the installation is complete, view the entire installed roof. If there is any defect, repair the leakage in time, clean the roof construction and installation site, and notify relevant personnel to inspect. Inspection methods include flushing test or inspection after rain. When ensuring the indoor bearing and driving longitudinal space of the closed floor bearing plate, excessive deformation of the structure and deformation of the compression bar shall be prevented in advance to ensure the overall stability of the indoor structure.
在各跨柱与车间立柱之间的测量段应设置稳定的柱间支撑系统,并根据车间结构、车间行车设置、振动设备、车间跨度、高度、测量段长度等条件。
The measuring section between each span column and workshop column shall be provided with a stable inter column support system according to the workshop structure, workshop crane setting, vibration equipment, workshop span, height, length of measuring section and other conditions.
济南楼承板
下柱支撑的位置是决定厂房纵向结构变形方向的主要因素,需要测量受力大小。下柱支撑应尽可能设置在测量断面之间,使行车梁等纵向结构应力随测量变化,观察室内断面两端的舒适弹性。
The position of the lower column support is the main factor determining the deformation direction of the longitudinal structure of the plant, and the force magnitude needs to be measured. The lower column support shall be set between the measuring sections as far as possible, so that the longitudinal structural stress of the driving beam changes with the measurement, and observe the comfort and elasticity of both ends of the indoor section.
楼承板露天存放时,应稍微倾斜放置(角度不宜过大),使雨雪等气候湿气尽快从板的缝隙中流出,当成捆的楼板与地面接触时,应提供垫板;捆扎堆放时,两捆之间应设置垫料,堆垛高度不得超过三捆。
When the floor bearing plate is stored in the open air, it should be placed at a slight angle (the angle should not be too large), so that the rain and snow and other weather moisture can flow out from the gap of the plate as soon as possible. When the bundled floor is in contact with the ground, a backing plate should be provided; When binding and stacking, padding shall be set between two bundles, and the stacking height shall not exceed three bundles.
楼承板露天存放时,如不能短时间使用,应尽量遮盖?;げ?。另外,楼承板装置的施工速度要快,从搬入入库到混凝土浇筑完成不超过两周。当楼板需要用软吊索安装在高处时,需要将楼板吊到高处,然后进行正常作业。使用软吊索,使楼板的质量不会被吊索损坏。
When the floor bearing plate is stored in the open air, if it cannot be used for a short time, the product shall be covered as much as possible. In addition, the construction speed of floor bearing plate device shall be fast, and it shall not exceed two weeks from moving into warehouse to the completion of concrete pouring. When the floor slab needs to be installed at a high place with a soft sling, the floor slab needs to be lifted to a high place, and then normal operation can be carried out. Use soft slings so that the quality of the floor will not be damaged by the slings.
以上是给大家分享的内容。如果您有任何疑问,可以随时来我们网站http://www.hhqhq.com进行咨询了解!
The above is for everyone to share. If you have any questions, you can come to our website at any time http://www.hhqhq.com Ask about it!