彩钢瓦房顶的骨架可谓是建筑的核心,因此对于它的制作方法有着高标准、高要求,本文就为大家介绍了如何制作彩钢瓦房顶的骨架,希望施工人员能够认真阅读。
The skeleton of the color steel tile roof is the core of the building, so there are high standards and requirements for its production method. This paper introduces how to make the skeleton of the color steel tile roof, and hopes that the construction personnel can read it carefully.
一、屋面
1、 Roofing
以山墙边做起点,由左而右(或同右而左)依顺序铺设。然后片板安置完毕后,沿板下缘拉准线,每片依准线安装,随时检查不使发生偏离。铺设面以自攻螺丝,沿每一板肋中心固定于衍条上。
Starting from the side of the gable, lay it from left to right (or the same as right to left) in sequence. Then, after the plates are placed, draw the alignment line along the lower edge of the plate, install each plate according to the alignment line, and check at any time to avoid deviation. The laying surface is fixed on the extension strip along the center of each plate rib with self tapping screws.
二、收边
2、 Edge trimming
屋面(含雨蓬)收边料搭接处,须以铝拉钉固定及止水胶。然后屋面收边平板自攻螺丝头及铝拉钉头,须以止水胶防止。收边板施工固定方式,依其现场丈量需做变更时,以确认后制做图为准。
The lap joint of roof (including canopy) edge material must be fixed with aluminum pull nails and water stop glue. Then the self tapping screw head and aluminum pull screw head of the roof trimming plate must be prevented by water stop glue. When the construction and fixing method of the edge plate needs to be changed according to its on-site measurement, the drawing shall prevail after confirmation.
三、固定方法
3、 Fixing method
济南彩钢瓦厂家建议排个固定座,以自攻螺丝固定于檩条左边,然后于檩条弹墨线做基准线,接着固定同排固定座。接着块板之肋部对准固定座之肋板,压下卡入检查是否扣合正确。然后将固定座短臂扣上块已铺好之面板阴肋,依前述方法施工,并调整。按上述顺序铺设,所??罩新ジ蠹湫∮诎蹇硪话胧?,仅用固定座短臂固定板片,其余空间以泛水收头。如所??占浯笥诎蹇硪话胧?,则以固定座固定板片,其超出部分裁除。
Jinan color steel tile manufacturer suggests to arrange a fixed seat, fix it on the left side of the purlin with self tapping screws, then snap the ink line on the purlin as the reference line, and then fix the fixed seat in the same row. Then align the rib of the plate with the rib of the fixed seat, press down and snap it in to check whether it is buckled correctly. Then buckle the short arm of the fixed base with a paved panel female rib, construct according to the above method, and adjust. Lay in the above order. When the remaining space between towers in the air is less than half the width of the slab, only fix the slab with the short arm of the fixed seat, and the rest of the space ends with flashing. If the remaining space is greater than half of the plate width, fix the plate with a fixed seat, and the excess part will be cut off.
彩钢瓦屋面施工时如何进行防控
How to prevent and control the construction of colored steel tile roof
1、由于屋面坡度较大而且屋脊较多,在施工过程中对屋脊梁、檐口、老虎窗、汇(分)水线起止点等部位的标高控制;对于、坡度阴角线、坡度阳角线、檐口线、转角点、汇(分)水线起止点的定位;脚手架搭拆时应注意施工,并确保施工正常进行。
1. As the roof slope is large and there are many ridges, the elevation control of roof ridge, cornice, dormer window, starting and ending points of catchment (Branch) waterline and other parts during the construction process; For the positioning of the starting and ending points of the internal corner line of the slope, the external corner line of the slope, the cornice line, the corner point and the catchment (Branch) waterline; Pay attention to the construction during scaffold erection and dismantling and ensure the normal construction.
2、屋面坡度较大,基层处理及挂瓦期间严格对工人做好技术交底,做好防护措施。
2. The roof slope is large, and the technical disclosure and protective measures shall be strictly carried out to the workers during the base treatment and tile hanging.
3、严格控制好彩钢瓦的排列,阴角、阳角、端头瓦以及与出屋面构筑物交界处处理好,谨防漏水。
3. Strictly control the arrangement of colored steel tiles, and handle the internal corners, external corners, end tiles and the junction with the roof structure to prevent water leakage.
4、彩钢瓦厂家建议屋面周边和预留孔洞部位设置护栏和网或其他防止坠落的防护措施。
4. The manufacturer of colored steel tiles suggests that guardrails and nets or other protective measures to prevent falling should be set around the roof and the reserved holes.